Estimator Online
(602) 744-0280
Fire Suppression SystemsCommercial · Healthcare · Education · Industrial

Pipe threaded.
Drawings approved.
Building cleared.

We install NFPA-compliant fire sprinkler systems for commercial builds, hospitals, and schools. Run the estimator — get a number before you pick up the phone.

Live
v2.4 · NFPA 2024 ed.
ft²
ft

Estimates based on NFPA 13 (2022 ed.) standard coverage areas. Final head count and hydraulic calculations determined during formal engineering review.

Estimate Output

Enter building parameters
to generate estimate

NICET Level IV Engineers
99.2% first-pass AHJ approval
Bid response within 1 business day
847+ commercial projects completed
NFPA 13 Certified
NICET Level IV Engineers
Shop Drawing Submittal
Hydraulic Calculations
AHJ Inspection Coordination
Flow Test & Certification
As-Built Drawings Delivered
99.2% First-Pass Approval
Commercial · Healthcare · Education
NFPA 13 Certified
NICET Level IV Engineers
Shop Drawing Submittal
Hydraulic Calculations
AHJ Inspection Coordination
Flow Test & Certification
As-Built Drawings Delivered
99.2% First-Pass Approval
Commercial · Healthcare · Education

Every job, accounted for.
Nothing improvised.

Click any phase to see deliverables, timelines, and applicable code sections. This is how a Suppress project runs — from the first walk to the final signature.

Physical walk-through of all floors, ceiling plenum access, structural member identification, existing MEP coordination. We leave with measured drawings and a confirmed scope letter — no guessing in the hydraulic calcs.

NFPA 13 §22.1 survey requirements
IBC §903 coordination
MEP clearance confirmation
Measured floor plan markup
PDF / DWG
Scope confirmation letter
PDF
Ceiling obstruction log
XLSX

Demand-based hydraulic analysis using SprinkCAD. Water supply data from utility test or on-site flow test. We size every pipe segment, verify residual pressure at the most remote head, and document the safety margin.

NFPA 13 §28 hydraulic design
AWWA C151 pipe standards
UL Listed components only
Hydraulic calculation report
PDF
Water supply curve
PDF
Pipe schedule summary
XLSX

Full permit-ready shop drawing package: head layout, pipe routing, hanger schedule, riser diagram, and equipment cut sheets. Formatted to AHJ requirements. We track the submittal through the plan review cycle and respond to all correction notices within 48 hours.

NFPA 13 §4.1 working plan requirements
AHJ formatting compliance
P.E. stamp (where required)
Sprinkler head layout (all floors)
PDF / DWG
Pipe routing & hanger schedule
PDF
Riser diagram & valve schedule
PDF
Equipment cut sheets (UL Listed)
PDF

Main, cross-main, and branch line installation per approved drawings. All pipe threaded or roll-grooved per schedule. Hangers at code-required intervals. Coordination meetings with GC superintendent at phase entry and weekly thereafter.

NFPA 13 §9 pipe and fittings
NFPA 13 §17 hangers
OSHA 1926 fall protection
Daily field progress photos
JPG / cloud share
Deviation log (if any)
PDF
Rough-in inspection request
AHJ form

Sprinkler head installation after ceiling finish. Escutcheon plates, recessed trim rings, and cover plates installed per reflected ceiling plan. Concealed heads torqued to manufacturer spec. Final visual inspection by PM before calling for AHJ.

Manufacturer torque specs
NFPA 13 §10.2 clearance requirements
RCP coordination
Head installation checklist
PDF
Escutcheon / cover plate log
XLSX

System flush per NFPA 13 §29.1, main drain test, and inspector's test valve flow verification. We document actual residual pressures against the approved hydraulic calcs. Discrepancies resolved before AHJ inspection is scheduled.

NFPA 13 §29.1 flushing
NFPA 25 §13.2 main drain test
FM Global data sheet (if applicable)
Flush certificate
PDF
Main drain test data sheet
PDF
Inspector test flow record
PDF

We attend every AHJ inspection. If a correction notice is issued, we track each item to closure and re-inspect at no additional mobilization charge. You get a signed inspection record and the fire suppression line item cleared on your certificate of occupancy checklist.

IBC §901.5 final acceptance testing
NFPA 13 §29.2 acceptance tests
CO checklist clearance
AHJ inspection record (signed)
PDF
As-built drawings
PDF / DWG
O&M manual
PDF binder
Warranty documentation
PDF

All phases above reflect a standard commercial new-construction project. Retrofit and phased-occupancy projects may require adjusted sequencing. Phase durations assume permit-ready drawings and unobstructed ceiling access. AHJ response times not included.

Every occupancy.
Every code path.

NFPA 13 / NFPA 101
Licensed & Insured

Healthcare & Hospitals

CMS compliance, infection control requirements, and occupied-space coordination. We schedule rough-in around patient care areas and maintain infection control barriers throughout.

115 ft² max

Light Hazard

45–90 days

ICRA compliance

Occupied-space phasing
Infection control barriers
ICRA protocols
CMS survey readiness
847+

Projects completed

99.2%

1st-pass AHJ approval rate

12

States licensed

0

CO delays due to fire suppression

"Suppress submitted a clean package first time through. No correction notices, no delays. The AHJ signed off in one visit. That's the first time that's happened on a project this size."

Robert Dillard

Project Executive

Meridian Construction Group

Hospital Expansion — Phoenix, AZ
Project Size184,000 ft²
Floors6
Head Count1,412
Inspection ResultPass · 1st attempt

AHJ Inspection: Passed

Certificate of occupancy issued on schedule

Ready to pull a permit?
Let's build the package.

We respond to all bid requests within one business day with a scope confirmation and preliminary schedule.

Response within 1 business day
GC Resource

GC Spec Sheet

Division 21 spec language, standard submittal requirements, and coordination checklist for your project manual.

Includes: Division 21 spec language · Submittal checklist · Coordination matrix · Standard exclusions list

Office(602) 744-0280
Estimatingbids@suppressfp.com
Response time< 1 business day
Licensed inAZ · CO · TX · NV · NM
NICET Level IV
AFSA Member
NFPA 13 · 13R · 13D
Prevailing Wage
AZ Lic. #FP-2024-0891